There are no social or ecologic impacts while generating power using the wind parks.
Kamenskoe Wind Power – we will make Ukraine’s energy more sustainable, pure, safe and forward-looking

The project starts in
Interesting facts
Press releases
Safe for ecology

Virtually silent
Wind turbines do not make noise. They work quietly enough. The noise at 150-200 distance from wind power station does not exceed the loudness of a usual household fridge. Even in sparsely populated and rural areas, where other noises can’t exceed the sound of working turbines, the sound of the wind is louder. There is only a least sound of the wind contacting with the blades of the rotor.
Groundwaters remain
The fields do not dry
Installation of towers for wind power units, will be placed at a significant distance one from another. It will have no impact on the balance of the groundwaters due to a significant area and is located under the depth of the basement.


The climate remains changeless
For today while designing the power plants the impact to the local climate is technologically brought to neutral. And more, wind power stations deliver more warm air down, mix it, slower wind speed. It increases evaporation from the surface, increasing the quantity of precipitation twice and stimulates the growth of plants.
No vibrations, no impact on residential areas of animals
Usually such stations are built near to the power lines. Areas where animals live have been already fragmented and changed due to livestock and agriculture. The station itself requires a bit of land for the turbine, the road to the turbine and a power line. The land around such objects can be used as usual.


Recovery of greenery
The project of recultivation provides for mandatory recovery of greenery (trees planting) at the territory that will be temporary involved during construction and other determined plots of land. The investor is obliged to recover impacted greenery and also to take care and to protect it.
Possible direct
investment in the region
How will we build?
We guarantee that construction of wind power units will be carried out fully into line with the Ukrainian law.
We guarantee that we will make every effort to reduce as much as possible the potential impact to the ecology while building
We guarantee that we will fully recover the natural ecosystem at the building sites.




